How to use Setup.exe

Step-by-step guide

Odoo - Sample 1 for three columns

Step 1

Align the Setup.exe to rail. (Expert tip: leave the Setup.exe closed) 

Secure the Setup.exe to one side of the server / network rack ensuring the Setup.exe's snap-in bolt locks in the 19" rail.


Odoo - Sample 2 for three columns

Step 2

Secure the Setup.exe to the opposite side again ensuring the Setup.exe's bolts lock in the 19" rail.

Odoo - Sample 3 for three columns

Step 3

Place equipment on top of the Setup.exe while the Setup.exe securely takes the weight. Once equipment is secured remove the Setup.exe.

Adjusting the brackets

Step 1

Rotate locking bolts to tighten or loosen. 
To adjust, loosen the extended locking bolts with one turn.
 

Step 2

With the loosened bolts slide the Setup.exe brackets over the 19" rail, push the brackets together by hand and hand tighten the nuts. The brackets should sit firm on the 19" rail but can have some play. Remove the Setup.exe from the 19" rail and then tighten the HEX-nuts using wrench or similar. 

*Note:  The Setup.exe fits all 19" rails with square punched holes. The Setup.exe can also be configured to fit 19" rails with different rail thicknesses. The Setup.exe is not compatible with 19" rails with threaded holes. The recommended maximum load-bearing capacity is 15kg. The load-bearing capacity is limited to the maximum weight per rack unit (RU) of the network rack.  Make sure all nuts are tight and  locking pins are fully inserted b efore use. Loads must be protected from the risk of damage caused by falling down through appropriate additional measures. The Setup.exe includes magnets. Keep away from data carriers, magnetic storage devices and sensitive electronic devices.




Phone

+43 1 99 71 960
Mon - Fri 9:00am till 5:00pm CET

Mail

support@patchbox.com
Response in 24 hours

Live Chat
Start a live-chat with our support team
Mon - Fri 9:00am till 5:00pm CET