/dev/mount How-To Guide

Installation & Setup

cage nut alternative installation

Step 1: Align with rail

Align the /dev/mount to rail.
Push the /dev/mount through the holes from behind making sure that the small tab aligns with the middle hole.

cage nut alternative installation

Step 2: Mount

Make sure to hold the /dev/mount straight. Press the front of the leg towards the 19” rail until the /dev/mount is securely in place.
Now all you need to do is to take the hex nuts and fasten the /dev/mount by hand. Only by hand. Do not use tools to tighten the /dev/mount!
cage nut alternative installation

Step 3: Dismount

Pull the /dev/mount towards your body placing pressure on the rear. It will then snap open and allows to be removed.

The /dev/mount fits square punched hole racks with EIA-310 specifications. Maximum rating per RU 15kg. Do not use if product deformed.  *Maximum torque of 3Nm – more can deform your 19“ rail / equipment.