/dev/mount

Step-by-Step Guide

Table of contents
Need additional help?

No worries, we’re here to support. Just get in touch with us and we will help you by all means.

Installation & Setup

cage nut alternative installation

Step 1: Align with rail

Align the /dev/mount to rail.  
Push the /dev/mount through the holes from behind making sure that the small tab aligns with the middle hole.

cage nut alternative installation

Step 2: Mount

Align the /dev/mount to rail.  
Push the /dev/mount through the holes from behind making sure that the small tab aligns with the middle hole.

cage nut alternative installation

Step 3: Dismount

Pull the /dev/mount towards your body placing pressure on the rear. It will then snap open and allows to be removed.

The /dev/mount fits square punched hole racks with EIA-310 specifications. Maximum rating per RU 15kg. Do not use if product deformed.  *Maximum torque of 3Nm – more can deform your 19“ rail / equipment.